Data center bottlenecks.
Solved before you invest.
For investors and developers of AI and hyperscale data centers. WHT engineers and the WaiMAP engines answer the three questions that decide a campus — where, when and how many MW can be connected, how it is powered until then, and how the heat leaves the site — in weeks, then stay with you as owner's engineer to commissioning.
- Energy supply — grid, on-site gas, solar + BESS, co-location
- Grid connection — time to power, non-firm capacity, bridging
- Cooling — liquid cooling, river / lake / sea water, high-efficiency chillers
32 years of energy EPC experience · 10+ GW executed in thermal, renewable and hydropower · ~7 GW of energy projects developed by WHT.
The problems — and our solutions
A · Energy supply
"Where does 100–1,000 MW come from, at what cost and CO₂?"
- Four supply strategies on your load, hour by hour: grid only, grid + on-site gas, gas island, solar + BESS + gas.
- Cost of power, CO₂ and renewable share side by side; 24/7 PPA and behind-the-meter co-location at hydro, nuclear or gas plants.
- Heat reuse and trigeneration to lower the energy bill.
B · Grid connection
"The grid says 2031 — we need power in 2028."
- Substations and lines within reach, capacity and queue, connection-date risk.
- Time-to-power plan: non-firm capacity with curtailment covered on site, bridging power, staged phases, self-build substation.
- MW servable year by year and the revenue of opening earlier.
C · Cooling
"80–130 kW racks, limited water, hot summers."
- Direct liquid cooling, dry coolers, evaporative — PUE, peak and water compared on your climate.
- River, lake or sea water: free cooling plus high-efficiency water-cooled chillers, with the river's capacity and the environmental limits checked.
- Intake, outfall, fish protection and permit path.
The site is the schedule
Prefabricated, liquid-cooled pods can be running within weeks of arriving — at a prepared site. Everything before that is the site's own supply chain, and it decides the opening date.
Site readiness schedule
- Land, permits, power and water as one network of months — the critical path and the long pole.
- Liquid-loop fill, flushing and pressure testing planned with the water supply: near-zero consumption is not zero fill.
- The cost of each month of delay, set against the cost of securing the site early.
AI load dynamics and island stability
- Training loads swing tens of megawatts in seconds — sized against grid-forming BESS and gas step capacity.
- Constant-power server supplies can destabilise islanded and weak sources; we specify the EMT and impedance-scan studies with OEM-validated models.
- Mitigations in the design: damping control, rack-level storage, load smoothing.
Advisory services by phase
1 · Site & power screening
2–4 weeks
Candidate sites ranked on grid, water, fibre, land, hazards and climate; power and cooling concept; first cost.
from USD 12,5002 · Pre-feasibility
6–10 weeks
Campus concept, time-to-power plan, supply strategies, cooling alternatives, CAPEX / OPEX, cost of power, financial model, risk register.
from USD 25,0003 · Feasibility & basic design
3–6 months
Single-line diagrams, substation and on-site plant, cooling plant and river system, layouts, specifications, permit support, grid application.
from USD 75,0004 · Owner's engineer & DD
Through construction
Tender documents, bid evaluation, design review, site supervision, testing and commissioning; technical due diligence for acquisitions and lenders.
by quotationStarting prices for the engineering fee; scope and fee are confirmed per project. Business and Enterprise subscribers get the platform preliminary study included and 10 / 20 % off the engineering fee — plans and levels.
How we work
Request a proposal [email protected]