Data Center Advisory · WHT Technology

Data center bottlenecks.
Solved before you invest.

For investors and developers of AI and hyperscale data centers. WHT engineers and the WaiMAP engines answer the three questions that decide a campus — where, when and how many MW can be connected, how it is powered until then, and how the heat leaves the site — in weeks, then stay with you as owner's engineer to commissioning.

3 problems one team
  • Energy supply — grid, on-site gas, solar + BESS, co-location
  • Grid connection — time to power, non-firm capacity, bridging
  • Cooling — liquid cooling, river / lake / sea water, high-efficiency chillers

32 years of energy EPC experience · 10+ GW executed in thermal, renewable and hydropower · ~7 GW of energy projects developed by WHT.

The problems — and our solutions

A · Energy supply

"Where does 100–1,000 MW come from, at what cost and CO₂?"

  • Four supply strategies on your load, hour by hour: grid only, grid + on-site gas, gas island, solar + BESS + gas.
  • Cost of power, CO₂ and renewable share side by side; 24/7 PPA and behind-the-meter co-location at hydro, nuclear or gas plants.
  • Heat reuse and trigeneration to lower the energy bill.

B · Grid connection

"The grid says 2031 — we need power in 2028."

  • Substations and lines within reach, capacity and queue, connection-date risk.
  • Time-to-power plan: non-firm capacity with curtailment covered on site, bridging power, staged phases, self-build substation.
  • MW servable year by year and the revenue of opening earlier.

C · Cooling

"80–130 kW racks, limited water, hot summers."

  • Direct liquid cooling, dry coolers, evaporative — PUE, peak and water compared on your climate.
  • River, lake or sea water: free cooling plus high-efficiency water-cooled chillers, with the river's capacity and the environmental limits checked.
  • Intake, outfall, fish protection and permit path.

The site is the schedule

Prefabricated, liquid-cooled pods can be running within weeks of arriving — at a prepared site. Everything before that is the site's own supply chain, and it decides the opening date.

FeasibilitySpeed to landSpeed to approvalSpeed to powerSpeed to waterSpeed to buildSpeed to assembleSpeed to operation

Site readiness schedule

  • Land, permits, power and water as one network of months — the critical path and the long pole.
  • Liquid-loop fill, flushing and pressure testing planned with the water supply: near-zero consumption is not zero fill.
  • The cost of each month of delay, set against the cost of securing the site early.

AI load dynamics and island stability

  • Training loads swing tens of megawatts in seconds — sized against grid-forming BESS and gas step capacity.
  • Constant-power server supplies can destabilise islanded and weak sources; we specify the EMT and impedance-scan studies with OEM-validated models.
  • Mitigations in the design: damping control, rack-level storage, load smoothing.

Advisory services by phase

1 · Site & power screening

2–4 weeks

Candidate sites ranked on grid, water, fibre, land, hazards and climate; power and cooling concept; first cost.

from USD 12,500

2 · Pre-feasibility

6–10 weeks

Campus concept, time-to-power plan, supply strategies, cooling alternatives, CAPEX / OPEX, cost of power, financial model, risk register.

from USD 25,000

3 · Feasibility & basic design

3–6 months

Single-line diagrams, substation and on-site plant, cooling plant and river system, layouts, specifications, permit support, grid application.

from USD 75,000

4 · Owner's engineer & DD

Through construction

Tender documents, bid evaluation, design review, site supervision, testing and commissioning; technical due diligence for acquisitions and lenders.

by quotation

Starting prices for the engineering fee; scope and fee are confirmed per project. Business and Enterprise subscribers get the platform preliminary study included and 10 / 20 % off the engineering fee — plans and levels.

How we work

1 · BriefTarget MW, region, timing, constraints — a call or an e-mail.
2 · ProposalScope, deliverables and fixed fee within a few working days.
3 · Engines + engineersWaiMAP models the site, power and cooling hour by hour; WHT engineers check and sign.
4 · DecisionA report your board and lenders can read — and the team stays with you.

Request a proposal   [email protected]