Bankability & Data Trust
Two separate questions: can the data be trusted, and is the project ready for lender due diligence?
Data Trust & Evidence
Where the data comes from, how current and complete it is, what was measured, modelled or entered by you, and how the calculation was checked.
- Data Trust & Evidence moduleFor every module result in a project: an evidence register (source, provider and licence, period, resolution, spatial coverage, class — measured, modelled / reanalysis, user-supplied, assumed default or derived — how it was used and its limitations), quality checks and a Data Trust level High / Medium / Low per module. The level is a weighted checklist with the points of each criterion shown, together with what it rests on, which assumptions, what is missing and how far it can be trusted. It is not a certification.
- Sources, licences and datesReports name their data sources — on the cover (data basis), in the source notes of the sections and in the assumptions review before the final report: which public or licensed source (terrain, climate, OpenStreetMap, hazard catalogues, PVGIS / ERA5, published grid data) was used, with dates where the source provides them; unit rates in the engineering library are sourced and dated.
- Measured, modelled and user data kept apartYour uploads (survey terrain, boreholes, met-mast or solar time series, price series, BoQ) are used in place of open data and the report names the source; estimated values (for example grid capacity where no operator data is published) are marked as estimated.
- Uncertainty stated, not hiddenP50–P99 energy for solar and wind, estimate classes with accuracy ranges for cost, scenario and tornado sensitivities in the finance model.
- Missing data and conflictsData Trust lists missing required inputs and flags contradictions: capacity in the documents vs the module input, coordinates of modules far apart, CAPEX outside a benchmark band, yield outside a plausibility band, currency and FX; document intake lists conflicting values between revisions; report QA checks numbers in the text against the engines.
- Stale dataDated inputs (climate periods, price levels, library rates) are compared with a staleness limit you can set.
- Independent checkSolar, wind, BESS, electrical, water, mass-haul and line-mechanics results side by side with named open tools on the same inputs, with a green / amber / red band and the reason for any difference.
- Validation registryThe public validation report lists every comparison with values, differences, tool versions and dates (web page, PDF and JSON).
- Reproducible analysis recordThe project workspace keeps every analysis of a project: date, software version and build, an inputs fingerprint, the inputs and the key results — earlier analyses are never overwritten. The Data Trust report repeats the fingerprint per module with the source versions and the run date; trust levels are kept in the analysis history for comparison.
Bankability Assessment & Lender Due-Diligence Support
The technical, commercial and financial review of a project: what the evidence shows, which assumptions it rests on and what is still missing.
- Sector Bankability AssessmentSolar PV, BESS, wind, transmission & grid, and construction & infrastructure profiles in five categories: technical feasibility and design assumptions; CAPEX, OPEX, revenue and financial-model assumptions; land rights, permits, grid connection and contracts; risks, sensitivities and missing documents; independent expert review status. Items are answered from WaiMAP results where evidence exists, otherwise marked as document required. Output: a readiness level (Early screening, Developing, Advanced for lender review), gaps, a document request list and next steps — never a pass / fail certificate. Low data trust caps the readiness level.
- Technical due diligenceWeighted checklist of 91 items in 22 areas for PV, BESS and hybrid projects; EPC key terms, tests and hold points, red flags and a readiness verdict with the evidence each item needs.
- CAPEX, OPEX and revenue assumptionsBudget engine with dated benchmarks, estimate classes, escalation and contingency; engineering library of sourced unit rates.
- Financial modelAnnual project-finance model: debt sculpting, DSCR, LLCR, equity and project IRR, NPV, LCOE / LCOS, break-even tariff, scenarios and tornado.
- Storage economicsBESS economic analysis (EIRR, ENPV, benefit / cost, switching values), delivery models and risk allocation matrix.
- Site, grid and permitting risks8-axis go / no-go screen (resource, grid, land, environment, hazards, market, social, logistics), grid-connection options, ESIA screening.
Data Trust level — how it is derived
A weighted checklist per module; the report shows every criterion with its points. High ≥ 75, Medium ≥ 50, Low below 50.
- Sources and licences documented15 points
- Primary data quality (measured › user site data › derived › modelled › default)20 points
- Required inputs complete15 points
- Uncertainty quantified10 points
- No contradictions15 points
- Data current (staleness limit)10 points
- Independent check (green / amber; red caps the level)15 points
Readiness level — not a pass / fail
The Bankability Assessment reports a readiness level, gaps, document requests and next steps.
- Early screeningConcept or screening evidence; key documents and site data still missing, or a critical red item.
- DevelopingMain analyses done with partly confirmed data (coverage ≥ 40 %, score ≥ 50 %); gaps listed.
- Advanced for lender reviewCoverage ≥ 75 %, score ≥ 75 %, no red item — ready for an independent engineer and the lender to review. Low data trust caps the level at Early screening, medium at Developing.
By sector
What WaiMAP examines today for each sector. Every result comes with the evidence it rests on, its assumptions and what is missing — not only a score.
Solar PV
Irradiation data source and uncertainty, yield method and independent check, losses and degradation, layout and electrical design, land, CAPEX / OPEX against a benchmark band, DSCR on P90, grid connection risk.
BESS
MW / MWh and duration, efficiency, degradation and augmentation, cycling against the warranty, revenue scenarios and the price data behind them, fire safety (NFPA 855 / UL 9540A items), long-term service agreement, connection.
Wind
Resource and measurement quality (mast or reanalysis, MCP R², data recovery), energy-yield uncertainty and P90, layout and wakes, turbine power curve, access.
Transmission & grid
Corridor alternatives, protected and residential areas along the route, line mechanics and clearances, LiDAR survey, substations, electrical studies, permits and rights of way.
Construction & infrastructure
Ground model confidence, topography and drainage, quantities and mass haul, survey accuracy, access and logistics, cost estimate class, execution risks.