Drawing check

Is this single-line diagram right?

Your engineer — or a contractor — drew it. Upload it and WaiMAP checks whether it holds together: capacity of every path against the load, redundancy, breaker ratings and short-circuit duty, cable sizes and equipment labels. Then ask for an engineer-signed review.

1 · UploadPDF or image. AI reads the values from the drawing (paid plans), or you type them in.
2 · CheckDeterministic rules — IEC 60909 short circuit, IEC 60364 cable ratings, Uptime tier logic. Every finding shows its basis.
3 · Signed reviewA WaiMAP engineer reviews the drawing and signs the report — or delivers the corrected drawing.

1 · The drawing

2 · Values on the drawing

Copy what the drawing says — not what it should say. Leave a field empty when the drawing does not show it.

3 · Engineer-signed review

A WaiMAP engineer reviews the drawing with the automatic check, then signs the review report. On request we also deliver the corrected single-line diagram and the calculation report. We reply by e-mail with the scope, the time and the offer.

Your drawing is used only to answer your request and is not shared. The automatic check is a screening of the values on the drawing; it does not replace the designer's calculations. Questions: [email protected]